Posts

Showing posts from May, 2014

Featured post

Home Plan In Pakistan

Image
Honey Home Plan in Pakistan   Address: Gujrat - Pakistan Ground Floor Area = 1362 sq.ft First Floor Area = 1060 sq.ft

Home Plans In Pakistan

Image
Kamran Home Plan in Gujrat Pakistan Ground Floor Plan Covered Area = 1150 sq.ft 3D View of Ground Floor  3D View of Ground Floor  at back side  3D View of Ground Floor  at back and left side

Slump Test - Construction Services In Pakistan

Image
 Concrete Slump Test      The Concrete Slump Test that measure the water cement ration w/c and work-ability of fresh concrete. Check the consistence of  fresh concrete and concrete flow. It's quick and easy check to see the concrete is suitable for work or not.      Slump Test an important  test which help us get homogeneous fresh concrete before casting. Slump Test is direct effect on compression strength of hardened of concrete. Slump Test Apparatus  (always clean and dry apparatus after use) Slump cone ( made of strong metal ) 1.5 mm thickness, internal dimension is 20 cm (8 inch) and above 10 cm (4 inch)  diameter and height of cone 30 cm (12 inch). Compacting steel bar 15 mm diameter and 60 cm height. Base Plate  Filling Collar Steel rule  Bursh and Mould Oil  Bucket or Wheelbarrow  Procedure Step by Step  Mixing the concrete sample properly  Ensure mould and base plate are clean  Place the mould at horizontal table or any floor or earth ( the f

Home Plans in Pakistan

Image
Home Plans In Pakistan Ground Floor and First Floor  Ground Floor Plan First Floor Plan Note: if you need complete detail with dimension detail contact us .....

Concrete Mixing Ratio

Image
Concrete Mixing Ratio What's is concrete mixing ration of different grade? The Concrete mixing proportion is.......! M-10 _____ 1:3:6     (cement : sand : aggregate) M-15 _____ 1:2:4     (cement : sand : aggregate) M-20 _____ 1:1.3:3  (cement : sand : aggregate) M-25 _____ 1:1:3     (cement : sand : aggregate) M-30 _____ 1:1:2     (nominal mix, cement : sand : aggregate) For more detail read IS 10262-2009 Concrete Cube